• TMC Engineering Ltd.

Cartwright’s Bedding

Client:  Cartwright’s Bedding, Nassau, Bahamas – 2018/2019

Role:  Project Manager, General Contractor, Steel Supply & Erection

Star Building Systems

Manufacturing, Warehouse & Retail Facility


  • 80’0″ x 125’0″ x 22’0″

  • 24ga PBR Solar White Roof

  • PBA 24ga Wall Panels

  • 4″ R-13 PSK-VR Roof & 3″ R-10 Wall Insulation

  • Mezzanine Joists & Decking

  • Gutters & Downspouts

  • Rod Bracing

Metal Building Accessories


  • Hurricane Rated Overhead Doors

  • Scissor Gates for Security

  • Dock Leveler

  • Masonry Entry Doors

  • Miami-Dade Rated Louvers

General Construction


  • Complete Design/Build

  • Structural Engineer – Accuro Consulting – Kevin Bain

  • Permitting with the Ministry of Works

  • Foundation, Slab, Masonry, Columns & Beams

  • Mezzanine Slab

  • Windows & Doors

  • MEP – Mechanical, Electrical & Plumbing

  • Civil Works – Site Drainage, Grading, Septic & Soakaway

  • Underground Utilities to Building

  • General Contractor’s All Risk Insurance


Fatal error: Uncaught wfWAFStorageFileException: Unable to save temporary file for atomic writing. in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:35 Stack trace: #0 /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(659): wfWAFStorageFile::atomicFilePutContents('/home/thereal2/...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('livewaf') #2 {main} thrown in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 35