• TMC Engineering Ltd.

Corky Holdings

Client:  Corky Holdings, Nassau, Bahamas

Role:  Design Optimization, Building System & Steel Erection

Star Building System


  • 200′ x 265′ x 29’6″

  • 18″ DoubleLok Standing Seam Roof

  • R40 Roof Insulation System

  • 3″ Exterior Insulated Panel System

  • Galvanized Secondary – Purlins & Girts

  • 2nd Floor Mezzanine System

  • Low Profile Hurricane Rated Vent System

  • Wind Rated Dome Skylights

  • 19’6″ Cantilevered Canopy

  • Solar Panel Compatible

  • 3070 Walk Doors

  • 4’x4′ Louvers

  • Framed Openings for Windows

MetlSpan Cool Room, Freezer & Cooler


  • Subfloor insulation installation

  • 5″ Insulated Wall Panels

  • 5″ Insulated Roof Panels

  • LoTemp Sliding Doors

Accessories


  • Overhead Doors w/Security Grates

  • Hurricane-Rated Windows

  • Interior Fire Windows

  • Straight Main Stairs

  • Galvanized Circular Stairs

  • U-Shape Utility Stairs


Fatal error: Uncaught wfWAFStorageFileException: Unable to save temporary file for atomic writing. in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:35 Stack trace: #0 /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(659): wfWAFStorageFile::atomicFilePutContents('/home/thereal2/...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('livewaf') #2 {main} thrown in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 35