• TMC Engineering Ltd.

Executive Motors Autobody Shop

Client:  Executive Motors, Auto Mall, Wulff Road, Nassau, Bahamas

Role:  General Construction; PEMB Supply & Erection, Paint Booth Installation

Star Building Systems – IBC2012 180mph Rated to exceed the Bahamas Building Code.

Autobody & Automotive Paint Shop 


  • 50’0″ x 60’0″ x 14’0″ (18′-2″ High Side)

  • Single Slope 1:12 Roof

  • Galvanized Purlins & Girts

  • 24ga PBR Solar White Roof Panels

  • PBR 24ga Wall Panels

  • 6″ R-19 and 4″ R-13 Vinyl Insulation

  • Gutters & Downspouts

  • Wind Column & Rod Bracing

Metal Building Accessories


  • Interior wainscoting liner panels

  • 3’x7′ 3070 Pre-Assembled Walk Doors

  • Miami-Dade Rated Overhead Doors, manual operation

  • Wind-Rated Ventilation Fixed Louvers by Bahamas Aluminum

  • Fixed Round Roof Vents

  • Designed for future Solar Panel installation


Fatal error: Uncaught wfWAFStorageFileException: Unable to save temporary file for atomic writing. in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:35 Stack trace: #0 /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(659): wfWAFStorageFile::atomicFilePutContents('/home/thereal2/...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('livewaf') #2 {main} thrown in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 35