• TMC Engineering Ltd.

LPIA Security Booth Canopy

Client:  Nassau Airport Development Co, Nassau, Bahamas

Role:  Complete Project Design-Build

Year:  2017

Star Building Systems


  • 41’7″ x 33’6″ x 13′

  • 0.5/12 Roof Slope

  • 36″ PBR Roof

  • Wind Column Bracing

  • Open Walls

  • Solar White Roof Panels

  • Galvanized Secondary – Purlins

  • Painted Main Frames

Foundation & Sidewalk Extension by Slip Finish – Marine & General Contractor


Fatal error: Uncaught wfWAFStorageFileException: Unable to save temporary file for atomic writing. in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:35 Stack trace: #0 /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(659): wfWAFStorageFile::atomicFilePutContents('/home/thereal2/...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('livewaf') #2 {main} thrown in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 35