• TMC Engineering Ltd.

Suez RO Facilities BVI

Client:  Suez – British Virgin Islands – 2019

Role:  Steel Building Design, Supply & Erection

Star Building Systems – IBC2012 200 mph Exposure D

Reverse Osmosis Metal Building Facility
Read more about this project on our blog:
Rebuilding after Hurricane Irma


  • Handsome Bay:

  • 55’0″ x 60’0″ x 14’0″

  • Capoons Bay:

  • 30’0″ x 75’0″ x 12’0″

  • Galvanized Main Frames & Secondary Framing

  • 22ga PBR Kynar Roof Panels w/Stainless Steel Screws

  • Gutters & Downspouts

  • Portal Frames, Fixed Base Bracing Columns & Angle Bracing

Metal Building Accessories


  • Gable Overhang Canopies

  • Parapet Wall for Masonry & Concrete


Fatal error: Uncaught wfWAFStorageFileException: Unable to save temporary file for atomic writing. in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:35 Stack trace: #0 /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(659): wfWAFStorageFile::atomicFilePutContents('/home/thereal2/...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('livewaf') #2 {main} thrown in /home/thereal2/public_html/steelbahamas/wp3/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 35